NUESTRO PORTAFOLIO DE TRABAJO
Proyectos de infraestructura en Florida Central
PROYECTOS RECIENTES
Mejoras de LS-2 FM y OUC - Parte C
Ciudad de Orlando
Instalación de 4300 pies lineales de tubería principal de PVC de 12” a 36”, 3700 pies lineales de tubería DI WM de 12” a 20” y 2065 pies lineales de alcantarillado por gravedad de 8”, con restauración completa de la calzada y del sitio.
Orlando, Florida
Brooksville (Condado de Hernando), Florida
Cruce de servicios públicos de Sunrise I-75
Hawk Sunrise LLC / Metro Development Group
Instalación de 4220 pies lineales de tubería principal de impulsión de PVC de 16” y 4216 pies lineales de tubería principal de agua de PVC de 16”
Haines City, Florida
Campo de pozos 3A del acuífero del sureste del Bajo Florida
Florida Water Partners, una empresa conjunta de Garney/Wharton-Smith


Condado de Citrus, Florida
Suncoast Parkway II (SR 589) - SR 44 a CR 486
Superior Construction Company Southeast, LLC
PROYECTOS ADICIONALES

Kissimmee, FL
Sherwood Forest Phase I, II and Scott Blvd and Elese Drive Improvements
Equity Lifestyle, Inc.
Site development including earthwork and site work improvements across multiple phases.

Orlando, FL
IFB23-0529 LS 2 FM & OUC Improvements -- Part C
City of Orlando
Installation of 4,300 LF of 12"-36" PVC Force Main, 3,700 LF of 12"-20" Ductile Iron Water Main, and 2,065 LF of 8" Gravity Sewer with full roadway and site restoration.

Lakeland, FL
Deeson Road Lift Station & Force Main Improvements
Polk County
Installation of 10,000 LF of 6" PVC Force Main, tie-in to existing Lift Station, and installation of new Lift Station.

Spring Hill, FL
Chalmer Street Lift Station and Force Main Install
Hernando County BOCC
Installation of 3,900 LF of 12" PVC Force Main and installation of new Lift Station.

Brooksville, FL
Telecom Dr Pump Station and Corporate Blvd Force Main
Hernando County BOCC
Installation of 1,840 LF of 6" Force Main with tie-in to existing 12" Force Main.

Spring Hill, FL
Hernando County District A Phase 1 Septic-to-Sewer Project
Hernando County BOCC
Installation of 13,924 LF of Gravity Sewer, 2,313 LF of 4" PVC Force Main, 2,130 LF of 6" PVC Force Main, 3,873 LF of 8" PVC Force Main, and 676 LF of 8" Horizontal Directional Drill with full roadway and site restoration. Installation of two new Lift Stations.

Homosassa, FL
Imperial Gardens WWTP Decommissioning
Citrus County Board of Commissioners
Installation of 1,354 LF of pipe and a new Lift Station as part of wastewater treatment plant decommissioning.

Haines City, FL
Lake Hamilton SR-27 Lift Station and Force Main Improvements
Town of Lake Hamilton
Installation of 8,631 LF of 3"-8" PVC Force Main and rehabilitation of existing Lift Station.

Zephyrhills, FL
Pasco County RCW Interconnect
City of Zephyrhills
Installation of 13,000 LF of 6"-12" PVC Reclaimed Water main service.

Brooksville, FL
Sunrise I-75 Utility Crossing
Hawk Sunrise / Metro Development Group
Installation of 4,220 LF of 16" PVC Force Main and 4,216 LF of 16" PVC Water Main.

Orlando, FL
Lockheed Martin New Facilities Water Main
Lockheed Martin
Installation of 2,140 LF of 12" HDPE Water Main via Horizontal Directional Drilling.

Haines City, FL
Southeast Lower Floridian Aquifer Wellfield 3A
Polk Regional Water Cooperative
Installation of 16,944 LF of 30" Ductile Iron Pipe, 874 LF of 8" PVC, 175 LF of 30" Steel Pipe, 11 LF of 8" HDPE, and 7,206 LF of 8" and 30" PVC via Horizontal Directional Drilling for new Water Main service.

Zephyrhills, FL
Southeast Master Pump Station
Pasco County
Installation of 670 LF of 2"-24" PVC Pipe, Stainless Steel Pipe, and Ductile Iron Pipe for new Force Main service connecting to a new 2-million-gallon capacity Master Lift Station and Master Pump Station.

Orlando, FL
Beachline 2 & 3 Industrial Warehouse
V1 Beachline II & III, LLC
Installation of 3,587 LF of 6"-8" PVC Force Main, 7,959 LF of 12"-42" RCP Storm Drainage, 1,629 LF of 3" PVC Water Main, 296 LF of 6" Ductile Iron Pipe, 7,826 LF of 12" PVC Fire Main, and 21 LF of 2" Poly SDR9 Reclaimed Water service.